Due to the geometry of the main roof, this was a unique challenge. The roof was angled on multiple planes, with a movement joint located directly where the temporary roof was to be erected.
Considerations had to be made regarding the flexibility of the temporary roof, due to the location of the required fixings. Under no circumstances could the temporary roof act as a rigid structure, as this would be detrimental to the main roof. There were four different tie configurations on this scaffold alone, purely to accommodate the required movement.






Related Projects


Nuneaton Railway Station

Manchester Engineering Campus Development

John Dalton St, Manchester City Centre

100 Embankment, Manchester City Centre

Rosebush Reservoir, South Wales

Manchester Engineering Campus Development

Circle Square, Manchester City Centre

Castle Coch, Cardiff

Autism Centre, Bolton

Sir Charles Grove, Manchester City Centre

Standen Hall, Clitheroe

St Pauls Church, Shaw

University of Manchester

Bolton Sixth Form College, Bolton

Manchester Central Library

Manchester Airport

Ulverston Manor, Cumbria

Midlands

Lowry Mill, Manchester